FL
Dec 27, 2016
The Course is very interesting and helpful from all prospective. I'm the project Owner and it was great experience for better understanding of the scheduling, different techniques and Lean Delivery.
A
Aug 25, 2025
This specialization gave me a clear understanding of construction planning, scheduling, and management with practical examples. Very useful for civil engineers preparing for professional roles.
By Vivek P
•Jun 19, 2020
I find this course very interesting and I have learn alot form this . I like the vidoes as they explained the theoretical concepts with examples
By Jatin M
•Nov 23, 2016
Very briefly covered and clearly explained, but in my opinion it needs to add more on Risk assessment and management, and baseline scheduling.
By Joseph W K
•Nov 6, 2020
Good course. Some speakers could have used better real life examples to illustrate their concepts but overall very interesting
By Gerry J
•Apr 29, 2021
There are some technical difficulties that need to be worked out when completing the pop up questions.
Great course overall.
By Akshay K
•Sep 26, 2024
This is best course for construction projects management. It enhanced the working behaviour for work portfolio. Thanks
By Patsy L
•Oct 17, 2018
Love the first part of the course as there were lots of exercises. The second part of the course is more theoretical.
By Amar M
•Oct 24, 2021
Week 5 wasn't that productive in terms of keeping me on with activities like other weeks. Overall great course!
By Tamir G
•Jan 20, 2020
From the entire coarse I learned systematic basic knowledge about "what I should know about scheduling''.
By Juan P C
•Oct 17, 2017
Great introductory course for non civil engineers or architects that want to get involved in the industry
By Donavan E
•Oct 10, 2019
I feel that the softewares used in this industry was not presented properly. the visual aids were poor
By Ram j
•May 16, 2020
Informative. I would recommend taking the course to understand the basics of construction scheduling.
By Erich S
•Jul 20, 2020
I like the calculations. The Lean guy, Sam Spata covers too much too fast during his lectures.
By Kalamba B
•Jul 4, 2020
like this course, but much deeper learning would be more welcome on certain topics. thank you
By Elodie T
•May 3, 2020
Complete courses, but pity that some of the projection like software modules are bad quality.
By Joshua W
•May 14, 2017
Very informative and helps to look at other not traditional scheduling methods.
By Wiadita D A
•May 4, 2021
The risk allocation and planning section is a bit difficult to understand.
By Diego A
•May 14, 2020
The first three weeks of the course are way too basic and slow to develop.
By Michelle W
•Mar 18, 2021
I wish it wasn't "about" scheduling, but instead actually had scheduling.
By Zhanar B
•Feb 10, 2017
I like the course for its clear structure and straightforward content.
By Detorrie T
•Apr 6, 2018
This was a fast-paced and intense course brimming with great content.
By Aleksandra A
•Dec 4, 2020
I expected to see more examples of real-life construction projects.
By Kevin S
•Jun 8, 2020
Great intro to construction scheduling, from project flow to tech.
By Jelin S
•Jul 24, 2022
really good , there was need for better explaination of softwares
By amr e
•Oct 22, 2017
good course with a great experience as a beginner in scheduling.
By Toriano B
•Jul 9, 2023
I enjoyed the class but I really needed better interaction.